Location:  39 CHERRY AVE
Owner:     NEW OPPORTUNITIES ECONOMIC DEVELOPMENT
Permit Details: |
Permit Number: |
PR20200002293 |
Permit Status: |
Finalled |
| Permit Type: |
BD - Electrical |
Work Class: |
Renewal |
| Permit Issued: |
09/28/2020 |
Permit Expiration: |
11/16/2021 |
| Permit Description: |
downgrade existing cabinet from 125 amp to 100 amp run new 2" conduit from PPC to new battery cabinet
need to call 39 Cherry Avenue is different owner, no 39 Cherry Street |
SubPermits: |
SubPermit Number |
SubPermit Type |
SubPermit Details |
Status |
| PR2020000229301 |
BD - Electrical |
  |
Issued |
Inspections: |
Inspection Date |
Inspector |
Inspection Type |
Inspection Results |
| 11/16/2021 |
Dom Mascolo |
EL - Overceiling |
Not Required |
| 11/16/2021 |
Dom Mascolo |
EL-Rough |
Not Required |
| 11/16/2021 |
Dom Mascolo |
EL-Service |
Not Required |
| 11/16/2021 |
Dom Mascolo |
EL - Underground |
Not Required |
| 11/16/2021 |
Dom Mascolo |
EL-Final |
Passed |
|